The process of
organic fertilizer production line includes fermentation, stirring, crushing, granulation, drying, cooling, screening and packaging. Some people say that one person can do it, but is one person really enough? Today, let's analyze how many people a production line needs.
First of all, one person is responsible for feeding. After crushing, one person needs to shovel to another pile continuously. Not only the material has to be loaded, but also the size of the material should be paid attention to. Before the pile is full, it must be shoveled to another pile so as not to delay production. This work is necessary and important.
During the startup process, there must be a maintenance personnel to deal with the occurrence of various abnormal problems, so as to avoid too much delay in timeliness.
The other side is the maintenance personnel. When the
organic fertilizer production machine is damaged, this maintenance worker is necessary and the most important. In strict sense, the maintenance worker is a large part of the factor in terms of the timeliness and output of an equipment. It can be seen that an organic fertilizer production line needs at least three people to operate. In this way, everyone has a little bit of spectrum in mind, and no more resources will be wasted in recruiting employees.